Roadmap

Now, Next, Horizon

Every milestone states an evidence-based position and links to what supports it. Current operating reality is kept separate from active development and from architecture that is still forming. No delivery dates or quarters are claimed, because none have been committed.

How to read a state

Operating
live on a public surface you can open today
Public Test
reachable, but on a test deployment rather than in production
In Development
being built — a demo, a briefing, or a specification, not a product
Research Horizon
architecture still forming, with no committed delivery timing

Horizon 1 of 3 · 7 milestones

Now

Operating today on a public surface, with evidence you can open.

  1. Fixed-scope Defense Review available at a published price

    Operating

    A Starter Defense Review is purchasable at a flat $3,000, delivered in about seven days, with a sample report published so buyers can see the deliverable before committing.

    Verified
    6 May 2026
  2. Three-pillar infrastructure monitoring on a public subscription

    Operating

    Oracle, bridge, and liquidity-pool monitoring is running behind four published plans, with watchlists and alert delivery to Discord, Telegram, and webhooks.

    Verified
    29 Jul 2026
  3. Guided allocation with card and onchain USDC settlement

    Operating

    Selun's allocation wizard runs end to end, with both card checkout and onchain USDC settlement, and an optional certified decision report.

    System
    Selun
    Verified
    29 Jul 2026
  4. Agent-payable intelligence discoverable over Selun's x402 surface

    Operating

    Nine allocation and continuity endpoints are advertised in a live x402 discovery document, callable and settleable by an agent without a human account.

    System
    Selun
    Verified
    29 Jul 2026
  5. Continuity scenarios producing auditable decision records

    Operating

    SCE runs failure scenarios and emits a decision record for each, hashed and written to an append-only audit layer so the reasoning stays inspectable after the fact.

    Verified
    29 Jul 2026
  6. Operator-approved public distribution of infrastructure alerts

    Operating

    Cross-pillar alert previews can be approved and sent manually to public channels. Automatic public broadcast remains off for the bridge and liquidity-pool pillars.

    Verified
    1 Aug 2026

Horizon 2 of 3 · 2 milestones

Next

In public test, in demo, or in design-partner development. Reachable, but not finished.

  1. Protocol v0.1 reachable on Moonbase Alpha

    Public Test

    Vault, Treasury, Escrow, and Reserve are deployed to Moonbeam's testnet at v0.1, with a wallet-connect interface and portfolio view. No mainnet deployment is published.

    Verified
    29 Jul 2026
  2. Institutional settlement control layer in design-partner discussions

    In Development

    The control surface — eligibility, allocation ceilings, approved routes, approval boundaries, lifecycle state, and evidence return — is specified publicly and is being shaped with banks and core banking partners.

    Verified
    29 Jul 2026

Horizon 3 of 3 · 4 milestones

Horizon

Architecture still forming. Documented intent, no committed delivery timing.

  1. Guided wallet experience demonstrable end to end

    In Development

    Onboarding, portfolio stance, guided allocation through Selun, research, and monthly reporting are all walkable in a public demo running on sample data — not on live funds.

    Verified
    29 Jul 2026
  2. Protocol beyond testnet

    Research Horizon

    Moving the protocol past a v0.1 testnet deployment requires the reserve, escrow, and continuity paths to hold under adversarial conditions. No mainnet timing has been committed publicly.

    Verified
    29 Jul 2026
  3. Cross-chain capital routing through XCM

    Research Horizon

    The batch-based Escrow is designed to route investment to other parachains over XCM — parachain treasury strategies, cross-chain staking, and RWA flows without bridging risk. Described in the protocol documentation as future use.

    Verified
    29 Jul 2026
  4. Broader bridge and liquidity-pool provider coverage

    In Development

    Additional bridge providers are staged behind activation flags, and further pool adapters remain in the backlog. Coverage claims stay limited to providers that have actually been checked live.

    Verified
    5 Jul 2026